Today is the start of week 7; there are 3 more weeks left till the submission. I made a plan for my project with the timescale, comments on what should be done and what I need to finish to make this 3 weeks easier. A little time is left, and a lot should be done in this short period. However, I handled my project this time quite good, I do not feel behind a lot, some posts still need to be added, and I will do it as fast as possible. However, the practical part, including final sketches and design, is completed(see picture below). I can loudly say that I need to finish just the architecture board, 3d model and software model.
My plan is:
Week 7: Finish the 3d model this week or maybe in the middle of next week, and do a post about my experience.
I will finish my software model by 18/05/25 and post it.
Week 8- 9: I will start the Material and Location boards at the beginning of next week, and after I finish the software model, I will do the other one.
I can say that this term I managed my time scale really good, I have got everything under control, and if any unexpected circumstances do not happen, I will manage to finish everything on time and my outcome will be a good quality.



Call this 'Production Plan' please.
ReplyDeleteThe blog should reflect your plan up to the deadline, so try to post the work as you have outlined in this post.